This hole in my basement has a roughed-in drain pipe for a bathtub (can't really see it, but I've verified it's there):
As you can see, it's about 12"x16". As I prepare to finish the basement, I'm not really sure how I ought to handle this hole. Should I just run the subfloor up to the edges of the hole and then leave it as-is? or should I do something to seal it once the plumbing is finished to keep critters/moisture/cold from coming out of it?
Best Answer
If you use a tub with an above floor drain, you can finish the floor flush.
If you use a below floor drain, you should at a minimum put down poly, seal the edges with a sealant and cover with several inches of pea gravel.
If you want to insulate a bit, excavate a couple more inches and put down some XPS foam over the poly and then put the gravel over it.