How should you set these bases into concrete?
Do you push them all the way down? Or should you leave a gap underneath? If you leave a gap, how big a gap should you leave? It has drain holes on the bottom, which makes me think it needs to be off the concrete, but then you have the full weight of you 6×6 post on that one piece of steel.
What's the proper/best way to set this into concrete?
Best Answer
That base goes into a hole drilled into a concrete slab, and is then attached with epoxy. The base of the bracket bears on the cured slab. Follow the epoxy manufacturer's instructions regarding hole clearance and cleaning procedure.