Concrete – I did a bad job pouring a cement walkway, how can I fix it

concretelevelrepair

I poured three 4'x4' slabs to make a walkway beside my house. The first two look alright but the third one is a half inch lower than the one next to it and slopes up at the open end where I want to pour six more slabs. Of course I wanted my slabs to slope down the walkway but my third slab slopes back the wrong way.

Is there something I can use to fill this half inch and get it to slope the right way, or at least make it somewhat level?

Best Answer

A number of the low aggregate rapid set cements are good for applications down to a 1/2 inch. The patch is best made when the old cement is still fresh, and for good measure use some concrete bonding adhesive.