Concrete or gravel for deck post

deckpost

I am building a deck and keep getting some conflicting messages when it comes to backfilling the holes. Already dug down 24”, added gravel for drainage and 4-6” of concrete (hole día approx 12-15”). I am well below the frost line. Is it ok to just backfill with concrete for additional strength or is gravel/material removed the best way to go?

Best Answer

I would be on the safe side and use concrete.