We own a 1930 house we cavity brick walls and have a few damp problems..,
Our render goes over the top of our DPC (damp proof course). The DPC is only about 1cm above the level of the paving. So I need to lower the paving (or put in a dry zone ditch between the paving and the wall) and remove the render.
However the render is very hard, so the brick gets damaged when I try to remove a test section.
Hence it is likely the brick work will need to be re-rendered over the DPC – how can this be done without bridging the DPC?
Best Answer
Bridging the DPC is just asking for problems (IMHO).
One possible solution might be:
Such a method doesn't bridge the DPC.
Regardless of the rendering solution implemented you really need to address the high external ground level in relationship to the PDC. Personally if it was me, I would lower the paving so the top of paving is 150mm (min) below the DPC & the paving falls away from the house (structure).