Plumbing – Combi boiler chemical replacement

chemicalsplumbing

I have a combi boiler (less than 2 years old, with plumbing that may be 25 years old) and I'm doing some work which will require a full drain of the heating system.

I think I'm going to need some cleaner and some inhibitor, but I'm wondering – can I just add both to the newly-topped up system, or is there a process I'll need to follow?

I am looking at Sentinel X100 inhibitor and X400 cleaner

Best Answer

you need to drain the system and after using the cleaner, so put that in (and run the system a bit) before you start your maintennce. the inhibitor goes in with the new water when your maintenance is done.