Tile – 2nd floor bath remodel. Concrete under tile. What do I have to remove

bathroomsubfloortile

I am doing some preliminary research and investigation into remodeling my master bath.

The house was built in 2002 so not too old. The master bath is on second floor. I removed the air vent to see what I am dealing with under the tile and it appears to be some sort of metal mesh stapled to either a wood sub-floor or the joists with concrete on top of it, about 3/4" thick and then the tile.

I am going down to studs in this bathroom, but I'm unsure of the floor.

Can I remove the tile and thinset and just re-tile on the concrete 'sub-floor'?
Or will I likely need to remove the concrete too? (I would think that's overkill).

If removing the concrete is necessary, what replaces it?

Thanks for any advice!

Best Answer

Sounds like a standard old school "float" job: plywood, then (usually) tar paper, then expanded metal mesh (sometimes), then dry-pack concrete, then tile adhered with thin-set mortar. This was the standard way to get a strong flat substrate for tile before cement-board was common.

If you can get the tiles off with the cement still relatively flat and smooth (or if the cement can be made relatively flat and smooth) then it is perfectly fine to put new tile down on it... but it's a big if.