Tile – Shower Base over or to the side of tiles

bathroomtile

I am tiling my bathroom floor and putting in a new shower base.
What do i do first?
Do I put tiles on the whole floor and then but the base over it?
or put the base and then put the tiles to it?

Best Answer

You should put tub and tile backer board down on the floor where the shower will be and then once the tub is installed tile up to the edge. You dont want tile underneath as it may or may not end up level, it may or may not come loose after weight is put onto it, and most importantly grout is not waterproof...it will absorb water and you definitely dont want that under the shower.