I've 2-runs of 12/2 w/G romex supported to studs from breaker box up to where it needs to run unsupported 20' through and alongside (parallel) floor joists of finished floor/basement ceiling for 20' to a junction box at other end where again it'll be firmly supported to studs. My QUESTION is it OK to have it laying unsupported on the sheetrock ceiling while only being fastened to studs on both ends. Basement ceiling is finished I prefer not chopping into it??
Electrical – 20′ run of romex unsupported through confined-space basement finished ceiling
code-complianceconfined-spaceelectricalwiring
Related Topic
- Electrical – How to prep wiring for new lights in basement ceiling
- Electrical – BASEMENT EMT CONDUIT + 12G THNN WIRES + NM-B
- Electrical – run NM 12 ga circuits on a running board or MultiCable Staples across floor joists use in a basement with an unfinished ceiling
- Romex Wiring – Can NM-B Run in Conduit for More Than 10 Ft?
- Wiring for recessed lighting through ceiling with floor trusses
- Wiring – Rules for wiring and conduits on basement ceiling with or without drop ceiling
- LED Wiring – LED Flat Panel Wiring: Type NM/Romex or Lamp Cord?
Best Answer
This is fine
What you are describing falls under NEC 334.30(B) point 1:
So, go ahead and fish the cable through the ceiling as you plan to do.